Victory Field Basketball Court to be Moved Slightly, New Storage Approved

The basketball court at Victory Field will be moved farther from the backyards of neighbors and new, more attractive storage for athletic equipment will be installed in a different location. The Ad Hoc Committee on Victory Field Phase 2 continued its examination of what should happen to the track and courts area of the complex on Orchard Street. Having previously dealt with renovating the track and deciding against putting up netting around the track to stop soccer and lacrosse balls, on Tuesday night the group discussed the tennis and basketball courts and storage containers at at Victory Field. Basketball Court
One of the most popular parts of Victory Field is the basketball court, which sits at the end of the five tennis courts and next to the back driveway. Pickup games are played almost year-round, neighbors said, but the games also creates a lot of noise for those living near the court.

LETTER: Casual Recreation Opportunities at Victory Field Should Not be Lost

The renovation of Victory’s Field’s track area is up again for discussion. The Town Council has appointed an ad hoc committee to study proposed plans and make recommendations in September. These plans, basically identical to those put forward three years ago, would rob the area of much of its grass surface while introducing several intrusive and heavy-handed innovations which would go far toward destroying the open feeling which has made it so inviting and attractive a playground for generations of Watertown residents. Among the changes proposed are a parking lot, additional lighting for night games, rubber hardening of the eastern part of the ‘oval’ to concentrate track and field events, and a concrete pad just outside for the two equipment storage containers owned by the schools. A bocce court and long rows of black metal poles and netting at both ends of the field have not been approved by the committee.

Find Out About Phase 3 of Arsenal Mall Project at Community Meeting

A Community Meeting has been scheduled by Boylston Properties and Wilder Companies for Wednesday, July 26, 2017 from 6:30-8:30 p.m. in the Innovation Space at the Arsenal Yards/Mall. The purpose of the meeting is to review the Phase III/Building F plans of the Arsenal Yards Master Plan. Building F is proposed to be a seven story residential building with 58 housing unites and 45,000 square feet of retail and/or restaurant space. The proposal has one more story and 23 more housing units than proposed in Master Plan passed by the Planning Board. The building would be located where the current bridge between to the two sections of the malls are located, and would be near the northeast corner of Arsenal Park.

Candidate for 2-Year School Committee Seat is a Parent and Teacher

The first candidate for the two-year School Committee seat has been certified to be on the ballot, and the first-time challenger has experience as a Watertown parent and as a teacher in another school system. Lindsay Mosca will run for the School Committee seat being vacated by Candace Miller, who announced she will step down because she is leaving town. The two-year seat will be on the Town Election ballot in November, but will be separate from the four-year School Committee seats. Mosca sent out the following information:
I have lived in Watertown with my husband, Justin, since 2005. Our two young children, Jennie and Jacob (5 and 7 years old), attend the Lowell Elementary School. I teach mathematics at Lexington High School, and my husband is an engineer at VHB in Watertown.